company news
The Ministry of ecology and environment announces the 2018 batch of 20 operations of the third batch of
Classification :company newsDATE:2018-10-19

From May 9 to 13, the "Waste Clearance Action 2018" inspection teams continued to carry out inspections. A total of 2097 solid waste storage sites were verified and 1011 storage sites were found to have problems.

On the 10 and 12 May, the two batch of the ecological environment section carried out the supervision of 49 outstanding problems. Today, the Ministry of Ecology and Environment (MOE) lists 32 prominent problems found during the inspection from May 12 to 13, and urges local authorities to rectify within a specified time limit. Third batch of 32 Listing Supervision Problems serial number provinces and municipalities problems

1 An illegal aluminum smelting workshop near Liuzao Port, Jinxing Village, Zhuqiao Town, Pudong New Area, Shanghai, stored more than 500 tons of waste aluminum slag, partially submerged in the tributary channel of Liuzao Port.

Although the original landfill site in Jingkou District, Zhenjiang, Jiangsu Province was closed in 2003, there are still 100 tons of construction waste, 1000 tons of domestic waste and 100 tons of sand and stone in the site.

3 Dongjin Village, Xilaiqiao Town, Zhenjiang Yangzhong City, Jiangsu Province (Tieben Construction Site) is a storage site marked "Crop Straw Storage Site", which is close to the Yangtze River tributary and is about 10 meters away from the river. There are about 5,000 tons of general industrial waste and domestic waste in the storage, and no "three prevention" measures have been taken.

4 The Mengjiagang Wharf in Dantu District, Zhenjiang, Jiangsu Province is located on the beach of 1 kilometer north bank of the Yangtze River. The industrial solid waste is about 1400 tons, which is suspected to have been discarded by foundry.

5. A large amount of construction waste was stored in Siwanli (10 meters away from Siwanli River) of Hongshan Town, Wuxi, Jiangsu Province. The storage point was originally a low-lying pond, about 60 meters long, 50 meters wide and about 3 meters high. It was mainly composed of slag, soil, cement brick fragments, scrap iron wire and so on. The total weight was about 10,000 tons.

About 1300 tons of domestic waste and industrial solid waste are stored in the west of Hongshan refuse transfer station of Majiaqiao, Huangjin Village, Shuofang Street, Wuxi New Wu District, Jiangsu Province. After preliminary cleaning, it was found that solid waste was still buried about 3 meters below the ground, mainly including waste plastics, waste cloth head, domestic waste, industrial solid waste and so on. It is estimated that more than 1000 tons of underground landfill waste will remain.

7 There are about 200 barrels of polymerized waste residue in the aramid fiber experimental workshop of Yizheng Chemical Fiber Co., Ltd. of Yangzhou, Jiangsu Province, weighing about 6 tons. It is a hazardous waste and has not been stored in accordance with the requirements of the national environmental protection laws and regulations.

In the demolition area of Yunshun New Building Material Factory of Yangzhou City, Yongjiang District, Yangzhou City, Jiangsu Province, about 5000 tons of construction waste and fly ash brick residue were stored, mixed with domestic waste. The storage area is about 18000 square meters and 400 meters east.

9 The industrial solid waste storage site on the south side of Feiyun River in Yunzhou Street, Ruian, Zhejiang Province (about 10 meters from the nearest embankment of Feiyun River) is about 2500 tons of industrial solid waste stored in open air. There is a small amount of liquid accumulated on the site, and no anti-seepage measures are taken at the storage site.

10 The general solid waste disposal in the pre-construction period of Chang'an Shipping and Fast Wharf in Jinjiazhuang Street, Huashan District, Ma'anshan, Anhui Province, is not thorough. There are still a large number of remnants on the shore and under the bridge, estimated to be more than 100 tons; the storage point is located below the highest water level of the Yangtze River, and the ground surface of the storage site has not been treated for seepage control.

The Xiafan Formation of Youkou Village, Changdong Town, Southwest Changjiang High-tech Zone, is close to the riverbed of the southern branch of the Ganjiang River. About 300 tons of mixed wastes of sand, stone and silt are piled up and accompanied by the outflow of reddish-brown liquids. Some solid wastes have already flowed into the river.

There is a plastic crushing processing point near 320 National Highway of Tongjia Town, Yingtan, Jiangxi Province, where more than 30 tons of woven bags (containing a small amount of hazardous waste) are piled up, and more than 3000 tons of waste residue are cleaned. The ground is not treated for seepage control. Wastewater is discharged through seepage pits.

13 An illegal waste oil acquisition site (300 meters away from the Huajiang River) near the Wensha Expressway (behind the factory building of Jiangxi Chaofeng Building Material Co., Ltd.) in Nancheng County, Fuzhou, Jiangxi Province, has 41 waste oil drums piled up in the open air. Nine of them are filled with waste oil, and one of them is buried underground. One fourth of the horizontal oil tanks and waste machines are exposed to the ground. The total amount of oil is about 3 tons, and the surface oil seepage is serious. The purchase point of oil was recently investigated by local public security authorities, and the scene has not been cleared yet.

No. 10 Production Road, Nancheng County, Fuzhou, Jiangxi Province, is about 50 meters away from the Litan River (opposite the slope of the Return Hall). About 200 tons of plastic granular waste, about 1,000 tons of construction waste and about 2,000 tons of mining slag and soil are piled in open air.

15 Jiangxi Fuzhou Nancheng County Tianjingyuan Township on Caofang Village Huajiang River Zhoujiabao Bridge, near the west of Jiangxi Hongyu Building Materials Co., Ltd., 20 meters away from the Huajiang River, the river embankment on the open-air storage of about 20 used oil drums, four of which are full of waste oil (about 600 kg).

The cement tanker truck of Fuzhou Longhui Construction Material Co., Ltd. dumped the waste water from the tank washing to the ground of the factory and discharged it directly to the Litan River (the PH value of the tanker cleaning fluid was 13) by the 35 National Road in Nancheng County, Fuzhou, Jiangxi Province, resulting in the gray color of the water near the drainage outlet.

17 In Liangshui Village, Wudian Town, Wuyang Town, Xiangyang City, Hubei Province, the six sections of the yard were dumped and accumulated for a long time. The garbage in the yard was more than 1000 tons, and there were three large pits below to intercept the leakage of garbage. However, no seepage control measures and matching treatment facilities were taken, which seriously affected the lives of the surrounding residents.

About 5,000 tons of domestic refuse were deposited on the south side of the embankment at Jianli County, Jingzhou, Hubei Province (opposite the Liugang Pumping Station and the old Yangtze River) without any seepage control measures.

19 In Qingji Industrial Park, Yangjiachang Town, Jingzhou Public Security County, Hubei Province (east and southeast of Hubei Huaya High-tech New Materials Co., Ltd.), about 2 kilometers away from the Yangtze River, there are a number of domestic refuse and a small amount of industrial waste mixed storage, weighing more than 15,000 tons, leachate accumulated on the site, and the ground of the storage point has not been prevented.

 

RETURN